Instant Power, located in Dallas, Texas, provides drain cleaning products. While maintaining the existing MEP infrastructure and avoiding disruption of ongoing operations, TriArc rebuilt the perimeter walls inside an active chemical production and sales facility. Interior construction was completed without affecting exterior systems.