top of page

PROJECT PORTFOLIO: INSTANT POWER

logo.png
  • Role

General Contractor

  • Size/Scale of Project 

5,000 square feet

  • Context

Interior finish out inside an existing warehouse

  • Complexity/Challenges:

Completing the build out inside an operating facility that produces and sells chemicals. Perimeter walls had to be rebuilt while maintaining the existing MEP infrastructure that was attached while not affecting operations.

bottom of page